Steel vs Timber Beams — UK Structural Guide
Comparing steel and timber structural beams for UK buildings — span capability, cost, fire rating, thermal bridging and installation considerations.
Side-by-Side Comparison
| Property | Steel (UB/RSJ) | Glulam Timber | LVL/Engineered Timber |
|---|---|---|---|
| Typical domestic span | Up to 10m+ | Up to 6-8m | Up to 5-7m |
| Depth for 4m span | 152-203mm | 250-350mm | 220-300mm |
| Weight (4m beam) | 80-160 kg | 40-70 kg | 30-55 kg |
| Beam cost (4m) | £200-400 | £150-350 | £120-280 |
| Fire resistance (unprotected) | 15-20 mins | 30-60 mins (charring) | 30-60 mins |
| Thermal conductivity | 50 W/mK (severe cold bridge) | 0.13 W/mK (negligible) | 0.13 W/mK |
| Ease of handling | Heavy — needs 2-3 people | Lighter — 1-2 people | Lightest option |
| On-site modification | Difficult (grinder/drill) | Easy (saw, chisel) | Easy |
| Lifespan | 100+ years | 50-100+ years | 50-100+ years |
Pros and Cons
Steel Beams
Pros
- + Spans longer distances
- + Shallower depth for same span
- + Higher load capacity
- + No shrinkage or movement
- + Standard sizes readily available
Cons
- - Heavy — difficult to manoeuvre
- - Severe thermal bridging
- - Needs fire protection (plasterboard)
- - Higher overall cost
- - Needs corrosion protection if exposed
Timber Beams
Pros
- + No thermal bridging
- + Better fire performance (charring)
- + Lighter — easier to install
- + Lower embodied carbon
- + Can be left exposed (aesthetic)
Cons
- - Deeper section needed for same span
- - More limited span capacity
- - Glulam can be expensive for large sizes
- - Susceptible to moisture damage
- - May need longer lead times
UK Cost Comparison (2026 Prices)
For a typical domestic wall removal (3.5m opening in a loadbearing wall):
| Cost Element | Steel (152x89 UB) | Glulam Timber |
|---|---|---|
| Structural engineer | £300-500 | £300-500 |
| Beam (supply) | £200-350 | £150-300 |
| Padstones | £40-80 | £40-80 |
| Installation labour | £800-1,400 | £600-1,100 |
| Fire protection / casing | £150-300 | £0-100 (if exposed) |
| Building Control | £250-400 | £250-400 |
| Total | £1,740-3,030 | £1,340-2,480 |
When to Choose Each
Choose Steel When
- Spans exceed 5m
- Heavy loads above (masonry, bathrooms)
- Minimum depth is critical (headroom)
- Internal beam (thermal bridging not an issue)
- Point loads or concentrated loading
Choose Timber When
- Beam is in an external wall
- Exposed beam aesthetic wanted
- Spans under 5m with moderate loads
- Low-carbon construction goals
- Difficult access (lighter to carry)
Related Calculators
- Lintel Sizing Calculator — calculate lintel size for window and door openings
- Steel Beam Calculator — size steel beams for domestic openings
Next up: related pages
How We Calculate This
Frequently Asked Questions
Steel beams (RSJs/UBs) are needed when spans exceed 4-5m, loads are heavy (loadbearing walls above), or headroom is limited (steel is shallower for the same span). Timber beams (glulam, LVL or engineered) work well for spans up to 4-5m and lighter loads. A structural engineer must specify the beam size regardless of material.
A typical steel beam for a domestic opening (152x89 UB, 3-4m long) costs £200-400 for the steel, plus £800-1,500 for installation including padstones, propping, and making good. Total: £1,000-1,900. Timber glulam for a similar span costs £150-300 for the beam plus £600-1,200 installation. Steel is typically 20-30% more expensive overall.
Yes. Steel conducts heat 400 times faster than timber, creating a significant cold bridge in external walls. This causes condensation, mould and heat loss. Steel beams in external walls must be wrapped in insulation (typically 50mm rigid foam). Timber beams have negligible thermal bridging and are preferred in energy-efficient builds.
Steel loses strength rapidly above 300°C and can fail in a fire. In domestic properties, steel beams are usually encased in plasterboard (2 layers of 12.5mm for 30 minutes fire resistance, or 2 layers of 15mm for 60 minutes). Timber beams char slowly at a predictable rate and often perform better in fire than unprotected steel.
Yes. Any structural alteration requires Building Regulations approval (usually a building notice or full plans application). A structural engineer must calculate the beam size. This applies to both steel and timber beams. The Building Control officer will inspect padstones, bearings and fire protection.
Was this calculator helpful?
Last updated: April 2026
Verified against UK standards · estimates only, confirm with your supplier.