How to Install Decking — Step-by-Step UK Guide
Complete guide to building a timber or composite deck in the UK, from frame construction to board fixing and finishing.
What You'll Need
Tools
- Cordless drill/driver
- Circular saw or mitre saw
- Spirit level (1200mm)
- String line and pegs
- Tape measure
- Carpenter's square
- Spanner set (for coach bolts)
- Jigsaw (for notching)
- Spade
- Safety goggles and ear defenders
Materials
- Decking boards (timber or composite)
- Joists — 47 x 150mm C16 treated
- Bearer beams — 47 x 150mm doubled or 95 x 145mm
- Concrete deck blocks or post supports
- Stainless steel decking screws (5 x 60mm)
- Coach bolts (M10 x 150mm) for bearer connections
- Joist hangers
- DPM strips or joist tape
- Weed membrane and gravel (under deck)
- Decking oil or stain (for timber)
Before You Start
- Check for underground services before digging for post supports.
- Ensure the finished deck is below the DPC of the house. If attaching a ledger board, it must be below the DPC line.
- Use our Decking Calculator to work out board quantities and our Composite Decking Calculator if using composite boards.
- Clear the area of vegetation. Lay weed membrane and a 50mm gravel bed beneath the deck area to prevent weed growth and improve drainage.
- Allow timber to acclimatise on site for 48 hours before construction.
Step-by-Step Instructions
Step 1: Plan the Layout
Decide on the deck size, shape and board direction. Mark out the area with string lines. Check that it is square by measuring diagonals — they should be equal. Plan your joist layout at 400mm centres (or 300mm for composite boards).
Step 2: Install the Support Posts or Blocks
For a low-level deck (under 300mm), use concrete deck blocks placed at 1.2m centres to support the bearers. For raised decks, dig post holes at least 450mm deep, set 100mm x 100mm treated posts in concrete and allow to cure for 48 hours. Use post base brackets bolted to concrete pads as an alternative.
Step 3: Fit the Bearer Beams
Bearers run perpendicular to the joists and sit on the posts or blocks. Use doubled 47 x 150mm C16 timbers bolted together with M10 coach bolts at 400mm centres. Check each bearer is level and at the correct height. For a ledger board against the house, use M12 expanding anchors into the masonry (not into the mortar joints).
Step 4: Install the Joists
Fix joists at 400mm centres using joist hangers or skew-nailed to the bearers. Ensure all joists are level across the deck. Apply a slight fall (1:80) away from the house for drainage. Use DPM tape on top of each joist where it contacts the decking boards — this extends the life of both the joists and the boards.
Step 5: Fit the Decking Boards
Start at the house end with the first board parallel to the wall. Leave a 10mm expansion gap between the wall and the first board. Pre-drill and fix each board with two stainless steel screws at every joist crossing. Leave a 5-8mm gap between boards for drainage and expansion. Use spacers for consistent gaps.
Step 6: Trim the Edges
Once all boards are fixed, snap a chalk line along the overhanging edges and trim with a circular saw for a clean, straight edge. Fit a fascia board around the perimeter to conceal the subframe.
Step 7: Finish and Treat
For timber decking, apply two coats of decking oil or stain. Treat the end grain of all cut boards with end-grain preservative. Composite decking requires no treatment. Fit any steps, balustrades or lighting as needed.
Common Mistakes to Avoid
- Insufficient ventilation: Low-level decks must have airflow underneath. Leave gaps or install ventilation grilles to prevent timber rot.
- Wrong screw type: Never use mild steel screws — they corrode within months. Use stainless steel A2 or A4 grade screws only.
- No expansion gaps: Both timber and composite boards expand. Leave 5-8mm between boards and 10mm at walls. Composite boards can expand up to 6mm per 3.6m length.
- Joist centres too wide: 600mm centres (common in floor joists) causes bounce and flex in decking. Stick to 400mm maximum for timber, 300mm for composite.
- No ground preparation: Vegetation growing up through the deck looks terrible and holds moisture against the timber.
Cost Estimate (2026 UK Prices)
| Item | Typical Cost |
|---|---|
| Treated softwood decking boards (per m²) | £15-£25 |
| Composite decking boards (per m²) | £40-£90 |
| Joists and bearers (per m²) | £10-£18 |
| Concrete deck blocks (each) | £4-£7 |
| Stainless steel screws (box of 200) | £15-£25 |
| Decking oil (5L tin) | £25-£45 |
| Total for a 15m² timber deck (DIY) | £500-£900 |
Use our Decking Calculator and Composite Decking Calculator for exact material quantities.
Next up: related pages
Frequently Asked Questions
For domestic decking with joists spanning up to 1.8m between bearers, use 47mm x 150mm C16 treated softwood joists at 400mm centres. For composite decking, check the manufacturer's specifications — most require 400mm or even 300mm joist centres.
Decking is usually permitted development if the platform is no more than 300mm above ground level. If the decking is higher than 300mm, covers more than 50% of the garden, or is at the front of the property, you may need planning permission. Always check with your local council.
Pressure-treated softwood decking typically lasts 10-15 years with annual maintenance (cleaning and oiling). Hardwood decking can last 25-40 years. Composite decking lasts 25-30 years with minimal maintenance.
For timber decking, stainless steel screws (two per joist crossing) are the standard method. Pre-drill to avoid splitting. For composite decking, most manufacturers supply or recommend hidden clip fixings that slot into grooves on the board edges.
Was this calculator helpful?
Last updated: April 2026
Verified against UK standards · estimates only, confirm with your supplier.