Concrete Mix Calculator — Cement, Sand & Aggregate Quantities
Calculate how much cement, sand, and aggregate you need to mix concrete on site. Uses standard UK mix ratios for different applications.
Use our Concrete Volume Calculator if unsure
Material Prices (optional)
Weight per cement bag (default 25kg)
Extra for spillage and over-mixing (default 0%)
Safety notice
Structural elements must be designed or checked by a structural engineer before construction. Treat these figures as initial guidance for planning and budgeting, not a structural design.
Next up: related pages
How We Calculate This
This calculator works by the standard UK absolute-volume (dry-volume) method. Your required concrete volume is multiplied by the dry-volume factor of 1.54 — because 1 m³ of compacted concrete needs about 1.54 m³ of dry loose materials once voids and water uptake are allowed for — then split by the mix ratio and converted to mass using bulk densities of cement 1440 kg/m³, sharp sand 1600 kg/m³ and 20mm aggregate 1680 kg/m³.
Mix ratios explained (per m³)
- General purpose (1:2:3): 1 part cement, 2 parts sharp sand, 3 parts coarse aggregate. ≈370 kg cement (~15 × 25kg bags), 0.82 t sand, 1.29 t aggregate.
- Strong mix (1:1.5:2.5): Higher cement content for structural work. ≈444 kg cement (~18 bags), 0.74 t sand, 1.29 t aggregate.
- Weak mix (1:3:6): Lower cement for blinding and non-structural fill. ≈222 kg cement (~9 bags), 0.74 t sand, 1.55 t aggregate.
- Paving/post mix (1:2:4): Good all-rounder for fence posts and paving. ≈317 kg cement (~13 bags), 0.70 t sand, 1.48 t aggregate.
Each mix totals roughly 2.5 t of dry material per m³, in line with the ≈2.4 t/m³ density of normal-weight concrete. Figures are nominal estimates — actual yield varies with sand and aggregate moisture, grading and bulk density, so order a small margin over.
Standards reference
The 1:x:y figures above are common UK site / nominal mixes specified by volume — a builders’ merchant convention, not formal BS 8500 prescribed mixes. BS 8500 (the complementary British Standard to BS EN 206) instead specifies concrete by strength class and minimum cement content as designated mixes (GEN, FND, RC, PAV) or standardised prescribed mixes (ST1–ST5). For structural work subject to Building Regulations, specify the concrete to BS 8500 by strength class as directed by your structural engineer or Building Control rather than relying on a by-volume ratio.
Frequently Asked Questions
The most common general-purpose mix is 1:2:3 (one part cement, two parts sharp sand, three parts aggregate). This is suitable for foundations, paths, and most domestic concrete work. For structural elements, a stronger 1:1.5:2.5 mix is used. All ratios are by volume.
For a standard general-purpose 1:2:3 mix you need roughly 370 kg of cement per cubic metre — about 15 bags (25kg) — worked out by the absolute-volume method (1.54 dry factor). A stronger 1:1.5:2.5 mix needs around 444 kg, about 18 bags per m³. The exact amount varies slightly with aggregate size, sand bulk density, and moisture content.
Use sharp sand (also called concreting sand or grit sand) for making concrete — not building sand. Sharp sand has coarser, angular particles that interlock and give concrete its strength. Building sand (soft sand) is finer and is used for mortar and rendering, not concrete.
For most domestic concrete work, 20mm gravel aggregate is standard. Use 10mm aggregate for thinner sections (under 75mm) or where you need a smoother finish. Both are widely available from UK builders merchants as 'all-in ballast' or separately graded.
For small jobs (under 1 m3), site-mixing is usually cheaper. For larger pours (over 2 m3), ready-mix is often more cost-effective when you factor in labour time, mixer hire, and material waste. Ready-mix also gives a more consistent quality. The crossover point is typically around 1-2 m3. Use our Concrete Volume Calculator to work out the volume you need first.