Repointing Calculator — How Much Mortar for Repointing?
Calculate the mortar, sand, cement and lime needed for repointing brickwork. Supports standard, engineering and London stock bricks.
Total area of brickwork to be repointed
215mm is the metric standard work size. Imperial and handmade bricks vary (often around 228mm), so measure one on your wall
65mm is the metric standard. Pre-metric bricks run roughly 50 to 80mm by region; measure a course on your wall
Width of the mortar joint on the face. Standard: 10mm. This also sets the coursing, because a course is one brick plus one joint: 10mm gives the familiar 75mm gauge and 13.3 courses per metre, 20mm gives 85mm and 11.8. If your wall does not match, count the courses over a metre and scale the quantities. Coursing is computed from the brick face size you set above
SPAB: rake to twice the joint width, deeper on wide joints. That is 20mm for a standard 10mm joint and 40mm for a 20mm joint. LABC give 12mm to 19mm for standard brick joints, which is shallower
Adds 15% extra for dropped and unused mortar
15% is typical for repointing work
Average price per bag for cost estimate
Wet-to-dry mortar volume factor (default 1.33)
Safety notice
Structural elements must be designed or checked by a structural engineer before construction. Treat these figures as initial guidance for planning and budgeting, not a structural design.
Next up: related pages
How We Calculate This
This calculator determines the volume of mortar needed to fill the horizontal (bed) and vertical (perp) joints in your brickwork, then converts that volume into quantities of sand, cement and lime based on your chosen mortar mix.
The formula
Mortar volume = Wall area x (Horizontal joint volume + Vertical joint volume) per m²
How many joints there are per square metre depends on the coursing, and a course is one brick plus one joint. The Brick Development Association derive the coordinating size 225 x 112.5 x 75mm from the 215 x 102.5 x 65mm work size plus a nominal 10mm joint, and state that “this process should be applied to all size combinations of brick and mortar”. So your Joint Width sets the coursing here, it does not just set how wide each joint is:
- Courses per metre height: 1000 / (brick face height + joint width)
- Horizontal joint volume per m²: courses per m x 1m x joint width x raking depth
- Vertical joints per course per m: 1000 / (brick face length + joint width)
- Vertical joint volume per m²: perps per m x courses per m x brick face height x joint width x raking depth
For a standard 215 x 65mm brick with a 10mm joint that gives the familiar 75mm gauge, 1000 / 75 = 13.33 courses per metre and 1000 / 225 = 4.44 perps per metre per course. At a 20mm joint it is an 85mm gauge, 11.76 courses and 4.26 perps, which is about 12% less joint per square metre. Coursing is a property of your wall, so if yours does not match, measure a course and enter the real face height above: pre-1919 bricks are often shorter than 65mm, and the calculator now works from the size you give it.
Mortar mixes
- 1:1:6 (cement:lime:sand): General-purpose repointing mortar. Good workability and flexibility.
- 1:4 (cement:sand + plasticiser): Modern alternative. Stronger but less flexible than lime-based mixes.
- 1:3 (lime putty:sand): Heritage and conservation mortar. Softer, more breathable — essential for pre-1920 buildings. Lime putty is batched and sold by volume, so we report it in litres rather than 25kg bags.
Dry volume conversion
Wet mortar consolidates by roughly 25–33% from the loose dry mix volume, so we apply a conservative 1.33 dry-volume factor (adjustable in Advanced options) to the required wet volume before converting to material quantities. Bulk densities used: building/sharp sand 1600 kg/m³, OPC cement 1440 kg/m³ (the standard 0.0174 m³ per 25kg bag), and hydrated-lime powder 600 kg/m³. Mature lime putty (~1350 kg/m³) is measured by volume in litres for the conservation mix.
How much mortar to remove
The amount of mortar you rake out is the same amount you put back, so the bed-joint and perp-joint volumes shown in the results tell you both how much old mortar to remove and how much fresh mortar to mix. Rake out to at least twice the joint width, 20mm for a standard 10mm joint and 40mm for a 20mm joint, per SPAB best practice, which also says to go deeper still on wide joints and gives no fixed millimetre floor. LABC quote 12-19mm as the typical working range for standard brick joints, shallower than 2x for a 10mm joint. Set the raking depth in the inputs to match how deep you are cutting, and the calculator scales the volume accordingly. Use a plugging chisel or hand rake, not an angle grinder, which SPAB and LABC both warn damages the brick arrises.
Estimating repointing cost
Enter a price per 25kg bag and the calculator returns an indicative materials cost (cement plus hydrated lime; lime putty is volume-batched and excluded from the bag count). This is materials only — labour, scaffolding and access dominate a real repointing quote. As a 2026 UK guide, repointing labour-and-materials runs roughly £30-£60 per m² for cement mortar and £60-£90 per m² for lime mortar (source: UK trade cost guides), higher in London and the South East. Treat those as a sense-check against tradesperson quotes rather than a fixed price.
Frequently Asked Questions
For standard UK bricks (215x65mm) with 10mm joints raked to the recommended 20mm depth (twice the joint width), you need roughly 3-4 litres of mixed mortar per m² of wall, wastage included. Raking depth scales that in a straight line: rake twice as deep and you need twice the mortar. Joint width does not, and it is worth knowing why. A wider joint holds more mortar along its length, but it also makes the coursing looser, so there are fewer joints in each square metre of wall. Going from a 10mm joint to a 20mm one raises the quantity by about 75%, not 100%, and going down to 5mm cuts it to about 54%, not half. Our calculator works both effects out for your own dimensions.
For general repointing of modern brickwork, use a 1:1:6 mix (1 cement : 1 lime : 6 sand) or a 1:4 cement:sand mix with plasticiser. For older buildings (pre-1920) and conservation work, use a lime-based mortar (1:3 lime putty:sand) — cement-based mortar can damage soft historic bricks by being too hard and preventing moisture movement. See our Mortar Calculator for detailed mix quantities.
Rake out joints to a depth of at least twice the joint width, so 20mm for a typical 10mm joint and 40mm for a 20mm joint. That multiplier is SPAB best practice: "existing mortar should normally be raked out to a depth equivalent to twice the joint width (and deeper with wide joints)". SPAB give no fixed millimetre floor, and note that the two main UK sources differ here. LABC state 12mm to 19mm for standard brick joints in the same article that also recommends about twice the joint width, so their numeric range sits just below 2x for a 10mm joint. On soft or historic brickwork take the deeper figure; a thin surface skim has little to key into and fails early. The joint should be square-backed and free of loose material. Use a plugging chisel or hand mortar rake, not an angle grinder, which can damage the brick arrises and overcut the joints.
Use sharp sand (also called building sand or bricklaying sand) for repointing mortar. For a colour match with existing pointing, source sand locally or add a mortar tint. Avoid using soft sand (plasterer's sand) on its own as it produces a weaker mix. Many merchants sell pre-blended repointing sand with lime already included.
Good-quality repointing should last 50-100 years on a sheltered wall, or 25-50 years on an exposed wall. The main factors affecting longevity are mortar mix quality, correct joint preparation, weather during application, and aftercare (keeping the joints damp for 2-3 days to allow proper curing). Lime mortar is more flexible and can last longer on older buildings.
You remove all the old, weathered mortar from the joints down to a sound depth of at least twice the joint width, so 20mm for a typical 10mm joint. SPAB advise raking out to twice the joint width and deeper on wide joints, and set no fixed millimetre minimum. LABC give 12-19mm as the working range for standard brick joints, which is shallower than 2x for a 10mm joint, so the two do not fully agree and the conservation guidance is the more cautious of them. The volume of mortar you take out is the same volume you put back, which is exactly what this calculator works out: enter the wall area, joint width and raking depth and it reports the bed-joint and perp-joint volume in litres. Rake square-backed with a plugging chisel or hand mortar rake — both SPAB and LABC advise against disc cutters and angle grinders, which are hard to control and damage the brick arrises.
As a 2026 guide, UK repointing typically costs around £30-£60 per m² for cement-based mortar and £60-£90 per m² for lime mortar on period properties, with London and the South East at the upper end. Scaffolding (often £500-£1,000+) and access are charged separately, so a whole-house repoint commonly lands between £2,500 and £5,000+. These are market labour-and-material rates from UK trade-price guides (Checkatrade, MyJobQuote, WhatPrice), not a fixed standard, so always get itemised quotes for your job. This calculator does not price labour or scaffolding — it sizes the materials and gives a materials cost when you enter a price per 25kg bag.
It estimates the materials cost, not the full job price. Enter the average price you pay per 25kg bag in the optional price field and the calculator multiplies it by the number of cement and hydrated-lime bags needed (lime putty is sold by volume, so it is excluded from the bag count). It does not include labour, scaffolding, hire or waste disposal, which are usually the largest part of a repointing quote — for those, use the per-m2 ranges in the FAQ above as a sense-check against tradesperson quotes.