BS 8204-1 minimums: bonded ≥25mm, unbonded ≥50mm (≥65mm with heating pipes), floating/over-insulation ≥65mm (≥75mm with heating pipes), ≥25mm cover above pipes
Adds 10% extra for compaction and losses
10% recommended for most screed work
Sharp sand price per tonne
25kg cement bag price
Sharp sand bulk density in tonnes per m³. Default 1.6 (typical UK sharp/concreting sand; BS EN 13139 governs the grading). Yield assumption: sand vol = mortar vol.
Cement bulk density. Default 1440 kg/m³ (standard value for OPC / CEM I).
Wet density of pre-mixed liquid screed. Default 2.2 t/m³ (Tarmac Topflow Screed C TDS). Anhydrite (calcium-sulphate) flowing screeds are similar at ~2.1–2.25; check your product datasheet.
Next up: related pages
How We Calculate This
Our screed calculator works by calculating the total volume of screed needed based on your floor dimensions and desired depth, then determining the quantities of sand and cement required for your chosen mix ratio.
The formula
Volume (m³) = Length (m) × Width (m) × Depth (mm) ÷ 1000
For a traditional cement:sand screed at 1:N ratio, per m³ of finished screed (yield assumption: mortar vol ≈ sand vol, consistent with BS 8204-1 sand-cement screeds):
- Sand: 1 m³ × 1.6 t/m³ = 1.6 tonnes of sharp sand (regardless of ratio)
- Cement at 1:3: 1/3 m³ × 1440 kg/m³ = 480 kg ≈ 19 × 25kg bags
- Cement at 1:4: 1/4 m³ × 1440 kg/m³ = 360 kg ≈ 14 × 25kg bags
- Cement at 1:5: 1/5 m³ × 1440 kg/m³ = 288 kg ≈ 12 × 25kg bags
This gives a set density of about 1,960 kg/m³ at 1:4 (1.6 t sand + 0.36 t cement per m³), which sits inside the typical sand-cement screed set-density range of 1,800–2,000 kg/m³. Reporting sand by mass (not loose volume) avoids the dry-volume bulking error.
UK screed depth guidelines (BS 8204-1)
- Bonded screed: 25mm minimum (40mm nominal)
- Unbonded screed: 50mm minimum (65mm with heating pipes)
- Floating screed (over insulation): 65mm minimum (75mm with heating pipes)
- Cover over underfloor heating pipes: 25mm minimum above pipe tops
Sand quantities are based on sharp (concreting) sand at a typical bulk density of 1.6 tonnes per m³ (BS EN 13139 governs the grading). Cement is calculated using standard 25kg bags (Screwfix, Travis Perkins, Jewson). Liquid / self-levelling screed is calculated as a single tonnage of pumpable mix at a default wet density of 2.2 t/m³ (Tarmac Topflow Screed C technical data sheet; adjustable in advanced options for anhydrite/calcium-sulphate products). The 10% wastage factor accounts for compaction and normal losses.
Frequently Asked Questions
Per BS 8204-1, a traditional sand and cement levelling screed should be a minimum of 25mm when bonded directly to a concrete slab, 50mm when laid unbonded (65mm if it contains heating pipes), or 65mm when floating over insulation (75mm with heating pipes), always with at least 25mm cover above any pipes. Self-levelling/liquid screed can be thinner at 25–50mm; see our Self-Levelling Compound Calculator for bag quantities. Use our Underfloor Heating Coverage Calculator to size a UFH system. The thickness rules above come from BS 8204-1; Approved Document C covers floor moisture protection, not screed depth.
The standard mix for traditional floor screed is 1 part cement to 3-4 parts sharp sand (by volume). A 1:4 mix is most common for general domestic use. For heavier-duty areas like garages, a stronger 1:3 mix is recommended. The sand must be sharp (concreting) sand, not building sand, to achieve the correct strength. This calculator covers traditional, self-levelling and fast-set floor screed mixes used across UK domestic and commercial projects.
As a rule of thumb, traditional sand and cement screed dries at about 1 day per mm for the first 50mm, then roughly 2 days per mm beyond that, at good drying conditions (20°C and below 65% relative humidity). So a 65mm screed needs approximately 80 days (50 + 15×2), not 65. These are indicative only — always confirm with a moisture (RH) test reading 75% or below per BS 8203 before laying tiles or floor coverings. Self-levelling/liquid screed dries faster, and fast-set screed can be walked on in hours and tiled within days. Once dry, use our Floor Tile Calculator to work out tile quantities, or our Floor Levelling Calculator if the screed needs a levelling skim before tiling.
For a traditional sand-cement screed at any cement:sand ratio between 1:3 and 1:5, you need approximately 1.6 tonnes of sharp sand per m³ of finished screed (using the yield assumption that the cement fills voids in the sand, so mortar volume ≈ sand volume). This gives a set density of about 1,960 kg/m³ at 1:4, which sits inside the typical sand-cement screed set-density range of 1,800-2,000 kg/m³. The mix ratio determines the cement quantity, not the sand. A UK 'bulk bag' (often called a tonne bag) of sharp sand actually holds about 0.8-0.85 tonne and occupies roughly 0.5 m³ at the 1.6 t/m³ bulk density used here, so it is not a full tonne — order one bulk bag per ~0.8 tonne of sand needed. For a typical room (4m × 5m at 65mm depth = 1.30 m³ + 10% wastage = 1.43 m³), you need approximately 2.3 tonnes of sharp sand, which is about 3 bulk bags.
Yes, screeding over underfloor heating (UFH) is standard practice. Per BS 8204-1 you need at least 25mm of screed cover above the top of the pipes, and the total screed thickness must meet the minimum for the construction: 65mm for an unbonded screed containing pipes, or 75mm for a floating screed over insulation containing pipes. Self-levelling/liquid screed can run thinner with around 30mm cover over the pipes. The underfloor heating must be pressure tested before screeding, and do not commission (heat up) traditional screed for at least 21 days after laying. Size your UFH system first using our Underfloor Heating Coverage Calculator.