TradeCalculator.co.uk
UK Competent Person Schemes — Self-Certification
Complete list of UK competent person schemes for building regulations self-certification: electrical, gas, windows, solid fuel, renewables, plumbing and more.
Electrical Installation (Part P)
| Scheme | Operator | Coverage |
|---|---|---|
| NICEIC | NICEIC Group Ltd | All domestic electrical work under Part P |
| NAPIT | NAPIT Registration Ltd | All domestic electrical work under Part P |
| ELECSA | ELECSA Ltd | All domestic electrical work under Part P |
| STROMA | Stroma Certification | All domestic electrical work under Part P |
| BRE | BRE Global | All domestic electrical work under Part P |
Gas Installation (Part J)
| Scheme | Operator | Coverage |
|---|---|---|
| Gas Safe Register | Capita Gas Registration and Ancillary Services Ltd | All gas work — LEGALLY REQUIRED for anyone working on gas |
Note: Gas Safe registration is not optional — it is a legal requirement under the Gas Safety (Installation and Use) Regulations 1998. It is a criminal offence for anyone who is not Gas Safe registered to carry out work on gas fittings.
Windows, Doors and Glazing (Part L)
| Scheme | Operator | Coverage |
|---|---|---|
| FENSA | Glass and Glazing Federation (GGF) | Replacement windows and doors (most popular scheme) |
| CERTASS | CERTASS Ltd | Replacement windows and doors |
| GGFi / BFRC | GGF / BFRC | Window energy ratings and compliance |
Solid Fuel, Biomass and Chimneys (Part J)
| Scheme | Operator | Coverage |
|---|---|---|
| HETAS | HETAS Ltd | Solid fuel, wood burning stoves, biomass, chimneys and flues |
| OFTEC | Oil Firing Technical Association | Oil-fired appliances and storage tanks |
Renewable Energy and Microgeneration
| Scheme | Operator | Coverage |
|---|---|---|
| MCS | Microgeneration Certification Scheme | Solar PV, solar thermal, heat pumps, wind turbines, biomass |
| RECC | Renewable Energy Consumer Code | Consumer protection for renewable installations |
Note: MCS certification is required for access to the Smart Export Guarantee (SEG) for solar PV and for the Boiler Upgrade Scheme (BUS) for heat pumps.
Other Competent Person Schemes
| Work Type | Schemes | Building Regs Part |
|---|---|---|
| Plumbing and heating | APHC, CIPHE, SNIPEF (Scotland) | Part G (water), Part L (heating) |
| Cavity wall insulation | CIGA, BBA, NIA | Part L (conservation of fuel and power) |
| Air conditioning / ventilation | BESCA, HVCA | Part F, Part L |
| EV chargepoint installation | NAPIT, NICEIC, OZEV-approved | Part P, Part S |
Related Pages
See the BS 7671 18th Edition Changes, the Part P RCD Requirements, and the Part J Flue Sizing. Use the Competent Person Calculator to check whether your work is notifiable and which scheme covers it.
Next up: related pages
Frequently Asked Questions
A competent person scheme (CPS) allows registered installers to self-certify that their work complies with Building Regulations without the need for a separate building control inspection. The installer notifies the relevant scheme operator, who then notifies the local authority on behalf of the installer and issues a compliance certificate to the householder. This saves time and cost compared to making a separate building regulations application.
If notifiable work is carried out without using a CPS member or obtaining building control approval, the local authority can require the work to be opened up for inspection, or in the worst case, removed and redone. It also causes problems when selling the property — conveyancing solicitors check for building regulations compliance certificates. Retrospective regularisation is possible (for a fee) but is not guaranteed and may require intrusive inspection.
Notifiable work includes: replacement windows and doors, electrical work in kitchens/bathrooms/outdoors (Part P), gas appliance installation (Part J), solid fuel appliance and flue installation (Part J), hot water and heating systems (Part G/L), cavity wall insulation, and renewable energy installations. Some minor electrical work (like-for-like socket replacement, adding a fused spur) is non-notifiable and does not require CPS membership or building control.
No. Competent person schemes only exist for specific types of work that are controlled under Building Regulations. General building work (extensions, structural alterations, conversions) always requires a building control application — there is no CPS route for these. However, individual aspects of a larger project (e.g., the electrical work within an extension) can be self-certified by a CPS-registered installer.
Was this calculator helpful?
Last updated: April 2026
Verified against UK standards · estimates only, confirm with your supplier.