Part P Notification Calculator — Notifiable Electrical Work
Determine whether your electrical work is notifiable under Part P of the Building Regulations and compare CPS self-certification vs building control routes.
How We Calculate This
This calculator determines Part P notification status based on the type of work and its location.
Notifiable work
New circuits, consumer units, rewires, new wiring in bathroom/shower special locations, EV chargers and solar PV are notifiable. Outdoor work alone is NOT notifiable (SI 2013/10, 6 April 2013) but must still comply with BS 7671.
Compliance routes
CPS self-certification (no Building Control fee) or Building Control notification and inspection (£250-£500 fee).
Frequently Asked Questions
Related Calculators
Building Control Fee Calculator
Estimate building control fees for UK domestic projects including plan check, inspection and VAT.
Part L Compliance Calculator
Check element U-values against Part L 2021 targets for walls, floors, roofs and windows.
Part B Fire Strategy Calculator
Calculate fire resistance periods, escape distances and compartment sizes per Part B.
Part E Sound Test Calculator
Check separating wall and floor dB targets and select systems to achieve Part E compliance.
House Rewiring Calculator
Estimate circuits, cable lengths and consumer unit size for a house rewire.
Last updated: March 2026
All calculations are estimates. Verify with your supplier.