Foundation & Footings Calculator — Concrete Volume
Work out footings and concrete volumes for strip, trenchfill and extension foundations, based on soil type and UK Building Regulations guidance.
Total external perimeter of the building
Internal Walls (if any)
Load-bearing internal walls needing foundations
Average length of each internal wall
Minimum 450mm; 600mm typical for domestic
Leave at 0 to use recommended depth for soil type
Adds 10% extra for uneven trench bottoms and over-excavation
10% standard; 15-20% for rough or uneven ground
Ready-mix concrete price per cubic metre
Safety notice
Structural elements must be designed or checked by a structural engineer before construction. Treat these figures as initial guidance for planning and budgeting, not a structural design.
Next up: related pages
How We Calculate This
This calculator estimates the total trench length from your building dimensions, then calculates the trench volume and concrete needed based on soil type guidance.
The formula
Concrete volume = Total trench length × Width × Depth × Wastage factor
All measurements are in metres, so the result is in cubic metres (m³). As a quick check, a 0.6m wide trench 1.0m deep takes 0.6 m³ of concrete per metre of run (0.6 × 1.0), so a 40m run needs about 24 m³ before wastage. This calculator assumes trenchfill (concrete to near ground level). For a traditional strip footing, which only fills the bottom of the trench, multiply the length and width by the concrete thickness instead of the full trench depth.
Footings for an extension
For an extension, the official Planning Portal guidance is that it is good practice to excavate at least to the same depth as the bottom of the foundation of the adjacent building, so old and new move together and you avoid cracking at the junction. Where the new trench runs alongside the existing footing, excavate and concrete in short alternating (hit-and-miss) bays so you never undermine a long length of the existing wall. The footing concrete must still be at least 150mm thick, and its thickness must be no less than the projection beyond the wall face (Approved Document A 2013, para 2E2c).
UK Building Regulations guidance
Foundation depths follow Approved Document A (Structure) Section 2E and the shrinkable-clay convention set out in LABC guidance and NHBC Standards Chapter 4.2. (AD A Table 10 is a separate table — it gives minimum strip-footing widths against wall load, not depths.)
- Rock / Gravel / Sand (non-cohesive): Minimum 450mm depth (AD A §2E para 2E4 frost-protection minimum), 450mm typical width
- Clay (medium-shrinkage): The 900mm default is the medium-plasticity-clay depth. Low-plasticity clay may allow 750mm; high-plasticity clay needs 1000mm+. Plasticity class comes from a soil/desk study, independent of any tree influence. 600mm typical width
- Soft clay / Soft silt: Minimum 1000mm depth, 750mm+ width
These are minimum values. Actual foundation depths depend on local conditions, proximity to trees (especially on clay soils), drainage, and the specific loads being carried. On shrinkable clay within the influencing distance of trees, NHBC Standards Chapter 4.2 (using the species water-demand and soil volume-change tables) can require depths of 1.5m–2.5m or more.
Important note
This calculator provides estimates for planning and budgeting. Foundation design must be confirmed by your Building Control body or structural engineer, who will inspect the site conditions. Always get professional sign-off before pouring concrete.
Frequently Asked Questions
The minimum foundation depth depends on the soil type. On rock, gravel or sand (non-cohesive ground), 450mm is the minimum to clear frost action (Approved Document A Section 2E, para 2E4). On shrinkable clay, depths vary by plasticity class: 750mm for low-shrinkage clay, 900mm for medium and 1000mm for high — these three depths are given in AD A para 2E4 itself (and echoed by LABC / NHBC Standards Chapter 4.2), measured to get below the zone affected by seasonal moisture changes. Near trees on clay, depths of 1.5-2.5m or more may be needed depending on the species and distance. Always check with Building Control for your specific site.
Strip foundations use a relatively thin layer of concrete (typically 225mm) at the bottom of a trench, with blockwork built up from the concrete to ground level. Trenchfill pours concrete to near ground level, which is faster and requires less blockwork but uses more concrete. Trenchfill is preferred on clay soils and for speed.
For a standard domestic load-bearing wall, foundation width should be at least 450mm (for single-storey on good ground) to 600mm or more. Building Regulations Approved Document A, Table 10 provides minimum widths based on wall load and soil bearing capacity. Your Building Control officer will confirm the requirement.
Yes. All new foundations require Building Regulations approval. Building Control will need to inspect the excavated trenches before concrete is poured to verify the soil conditions and foundation depth. You must give them notice before covering up any foundation work.
For domestic strip and trenchfill foundations, C25/30 (RC 25/30 or FND 2 designation) is standard per BS 8500-2:2023 — the general-purpose GEN designated series (GEN0–GEN3) tops out at GEN3 and is not strong enough, so foundation concrete sits in the designated RC/FND series. This is equivalent to a 1:1.5:3 site mix. Use our Concrete Mix Calculator to work out the exact cement, sand and aggregate quantities for site-mixed concrete. For sites with sulfate-bearing soils (common in clay areas), a sulfate-resisting cement or designated mix (DC-2 or higher) may be required. Your Building Control officer can advise.
There is no single fixed depth — it depends on the ground and, crucially, on the existing house. The Building Regulations baseline (Approved Document A 2013, para 2E4) is a minimum of 0.45m to the underside on most non-cohesive ground to clear frost, rising on shrinkable clay to 0.75m (low shrinkage), 0.9m (medium) or 1.0m (high). For an extension, the Planning Portal's official guidance adds that it is good practice to excavate at least to the same depth as the bottom of the foundation of the adjacent building, so the new structure moves in harmony with the existing one and you avoid cracking at the junction. Near trees on clay, 1.5m to 2.5m or deeper can be required. Where the new trench runs alongside the existing footing, dig and concrete in short alternating (hit-and-miss) bays so you never undermine a long run of the existing wall. Building Control will inspect the open trench and confirm the depth before you pour.
Concrete volume for a trenchfill footing is simply total trench length × width × depth, all in metres, giving cubic metres (m³). For example, a 0.6m wide trench 1.0m deep needs 0.6 m³ of concrete for every metre of trench run (0.6 × 1.0 = 0.6 m³/m), so a 40m run of trench takes about 24 m³. A traditional strip footing only fills the bottom of the trench, so you multiply by the concrete thickness (commonly 225mm = 0.225m) rather than the full trench depth. Always add a wastage allowance — 10% is typical, 15-20% on rough or over-dug ground — because trench bottoms are rarely perfectly even. Ready-mix is ordered in 0.25 m³ steps, so round your final figure up. Enter your dimensions above and the calculator does this for you, including the wastage uplift.
Width is set by the wall load and the ground's bearing strength, read from Approved Document A 2013 Table 10. For typical light domestic loads (around 20-30 kN/m) on medium-dense gravel/sand or stiff clay, Table 10 gives a minimum strip width of about 250-300mm, but in practice 450-600mm is normal so the footing is wide enough to dig and work in and to suit a cavity wall. The concrete must be thick enough that its thickness T is at least the projection P beyond the wall face, and never less than 150mm (AD A para 2E2c). Depth follows the soil and the existing house as above. These are minimums — your Building Control officer or engineer confirms the final size from the actual loads and a check of the ground.
For plain (unreinforced) strip and trenchfill footings in non-aggressive soil, Approved Document A 2013 para 2E2b accepts grade ST2 or grade GEN1 concrete to BS 8500-2 as the minimum, or a site mix of 50kg of Portland cement to no more than 0.1 m³ (200kg) fine aggregate and 0.2 m³ (400kg) coarse aggregate. Most builders and ready-mix suppliers specify a stronger C25/30 (designated RC25/30 or FND2) for durability and consistency, which is good practice rather than a higher legal minimum. On chemically aggressive or sulfate-bearing ground (common in some clays), you must follow BS 8500-1 and BRE Special Digest 1 and use a sulfate-resisting designated FND mix instead. Your Building Control body confirms the grade for your site conditions.