How to Repoint Brickwork — Step-by-Step UK Guide
Complete guide to repointing brickwork in the UK, covering raking out old mortar, mortar selection, joint profiles and curing for a lasting repair.
What You'll Need
Tools
- Plugging chisel and lump hammer
- Mortar rake (hand or battery-powered)
- Pointing trowel (narrow, 10mm or 12mm)
- Hawk (mortar board)
- Brick jointer / striking iron
- Soft brush
- Spray bottle or garden hose
- Scaffold tower or ladder
- Bucket and mixing paddle or cement mixer
- Safety goggles, dust mask and gloves
Materials
- Pointing sand (fine, sharp or building sand depending on match)
- Cement (OPC) or hydraulic lime (NHL 3.5)
- Hydrated lime (for lime mortar mixes)
- Plasticiser (for cement mortars only)
- Mortar dye/pigment (if matching existing colour)
- Clean water
- Hessian or damp cloths (for curing lime mortar)
Before You Start
- Identify the brick type and age of the building. Pre-1919 buildings almost always need lime mortar. Using hard cement mortar on soft bricks causes irreversible damage.
- Match the new mortar colour and texture to existing sound mortar elsewhere on the building. Test a small area first and let it cure for a week — mortar colour changes significantly as it dries.
- Use our Repointing Calculator to estimate mortar quantities and our Mortar Calculator for mix ratios.
- Check the weather — avoid repointing in direct sun, rain, frost or strong wind. Ideal conditions are overcast and mild (5-25°C). Lime mortar is especially sensitive to weather.
- If the wall is listed or in a conservation area, check with your local conservation officer before starting. There may be specific mortar and technique requirements.
Step-by-Step Instructions
Step 1: Rake Out Old Mortar
Using a plugging chisel and lump hammer, or a battery-powered mortar rake, remove all loose and crumbling mortar to a depth of 15-20mm. Work carefully to avoid chipping the brick arrises (edges). Rake horizontal (bed) joints first, then vertical (perp) joints. For large areas, a mortar rake attachment on an angle grinder can speed up the work — but use with extreme care to avoid damaging bricks.
Step 2: Clean Out the Joints
Brush out all dust and loose material from the raked joints using a stiff brush. Then dampen the joints with a spray bottle or light hose spray. The bricks should be damp but not saturated — this prevents them from sucking moisture from the new mortar too quickly.
Step 3: Mix the Mortar
Mix the mortar to the correct ratio for your brick type. For modern bricks: 4:1 sand to cement with plasticiser. For older soft bricks: 1:1:6 or 1:2:9 cement:lime:sand, or pure NHL lime mortar at 1:2.5. The consistency should be firm — stiffer than bricklaying mortar. It should sit on the hawk without slumping.
Step 4: Fill the Joints
Load mortar onto the hawk. Using a narrow pointing trowel, press mortar firmly into the horizontal joints first, working in sections of about 1m. Push the mortar in layers — do not try to fill the full depth in one pass. Pack each layer firmly to avoid voids. Then fill the vertical joints.
Step 5: Shape the Joint Profile
Once the mortar is firm enough to hold a thumbprint (typically 30 minutes to 2 hours depending on conditions), shape the joint to the desired profile. For a flush joint, draw a flat trowel across the face. For a bucket-handle joint, run a rounded jointer along each joint. For a weather-struck joint, angle the trowel to slope the bed joint slightly. Match the profile to any existing sound pointing on the building.
Step 6: Brush Off Excess
Once the mortar has firmed up further (usually 3-4 hours), brush off all excess mortar and crumbs from the brick face using a soft brush. Use a stippling action — do not drag the brush along the fresh joints, as this will smear mortar onto the bricks.
Step 7: Cure the Mortar
For cement mortar: protect from rain for 24 hours and from frost for 48 hours. Cover with polythene if needed. For lime mortar: cure slowly by keeping damp with a spray mist and covering with damp hessian for 3-5 days. Lime mortar must not dry out too quickly or be exposed to direct sun during curing — it needs moisture to carbonate properly.
Step 8: Clean the Brickwork
After the mortar has cured (7 days for cement, 14 days for lime), clean any mortar stains from the brick face. Use clean water and a stiff brush. For stubborn stains on modern bricks, a dilute brick acid can be used — but never use acid on lime mortar or limestone/sandstone. Test on an inconspicuous area first.
Common Mistakes to Avoid
- Hard mortar on soft bricks: Using a strong cement mortar on pre-1919 soft bricks traps moisture and causes the brick faces to spall (blow off). Always use lime mortar on older buildings.
- Shallow raking: If you do not rake out to at least 15mm depth, the new mortar has insufficient depth to bond and will fall out within a few years.
- Ribbon pointing: Spreading mortar thinly over the brick face creates an ugly finish and traps water behind. The mortar should be flush with or slightly recessed from the brick face.
- Pointing in rain or frost: Rain washes out fresh mortar; frost destroys the bond. Check the forecast before starting.
- Not matching the existing mortar: Mismatched mortar colour, texture or joint profile ruins the appearance of the building. Always test a sample first.
Cost Estimate (2026 UK Prices)
| Item | Typical Cost |
|---|---|
| Pointing sand (25kg bag) | £3-£6 |
| Cement (25kg bag) | £5-£7 |
| Hydraulic lime NHL 3.5 (25kg bag) | £15-£25 |
| Hydrated lime (25kg bag) | £8-£12 |
| Mortar rake (battery powered) | £40-£80 |
| Pointing trowel | £8-£15 |
| Scaffold tower hire (per week) | £60-£120 |
| Total for a 10m² wall face (DIY) | £50-£150 |
Use our Repointing Calculator and Mortar Calculator for exact quantities for your project.
Next up: related pages
Frequently Asked Questions
Repointing is needed when mortar joints are crumbling, recessed more than 5mm, cracked, or missing altogether. Signs include damp patches on internal walls, white salt deposits (efflorescence) on the brick face, or you can crumble the mortar between your fingers. Most UK brickwork needs repointing every 25-50 years, depending on exposure and mortar type.
The repointing mortar must be weaker than the bricks — especially on older buildings with soft, hand-made bricks. For pre-1919 buildings, use a lime mortar (1:2:9 or 1:1:6 cement:lime:sand) or a pure hydraulic lime mortar (NHL 3.5 at 1:2.5). For harder modern bricks, a 4:1 (sand:cement) with plasticiser is fine. Never use hard cement mortar on soft bricks — it traps moisture and causes the brick faces to blow off.
Rake out old mortar to a minimum depth of 15-20mm — ideally twice the width of the joint. For a standard 10mm joint, 20mm depth is ideal. This gives the new mortar enough depth to key into the joint. Shallow repointing (under 10mm) will not last.
Mortar guns can speed up the filling of joints but they do not replace proper pointing technique. The mortar must be pressed firmly into the joint and finished to the correct profile. Gun-applied mortar still needs hand-finishing with a pointing trowel or jointer. On listed or heritage buildings, hand pointing is usually specified.
Good-quality repointing with the correct mortar should last 25-50 years on a sheltered wall and 15-25 years on an exposed wall. Using the wrong mortar (especially too-hard cement mortar on soft bricks) can cause damage within 5-10 years and necessitate costly brick replacement.