Part B Fire Resistance Ratings Reference

Minimum periods of fire resistance read cell by cell from Table B2, the element provisions from Table B1 and the fire doorset provisions from Table C1 of Approved Document B Volume 1 (2019 edition incorporating the 2020, 2022 and 2025 amendments, collated with the 2026 and 2029 amendments), with the table row and note number beside every figure.

Minimum Periods of Fire Resistance (AD B Appendix B, Table B2)

Table B2 is the only table in Approved Document B that sets minimum periods of fire resistance for elements of structure, and it is identical in Volume 1 (Dwellings) and Volume 2 (Buildings other than dwellings). You read it by purpose group down the side, then by the height of the top floor above ground across the top, with two further columns read on the depth of the lowest basement. The version below carries the banner “Effective until 1 September 2029”, so it is the in-force version.

Two headings that are easy to misread. The height columns are the height of the top floor above ground in a building or separated part of a building, not the number of storeys, and the notes state that for single storey buildings the periods under the heading “Up to 5” apply. Purpose group 1(a) is the block of flats; the dwellinghouse is 1(b) and 1(c). Getting those two the wrong way round changes almost every figure in the row.

Approved Document B Appendix B Table B2, minimum periods of fire resistance in minutes
Purpose group (Table B2 row)Basement more than 10 m deepBasement up to 10 mTop floor up to 5 mUp to 11 mUp to 18 mUp to 30 mMore than 30 m
1(a) Block of flats, without sprinkler system906030 †60 + §Not permitted (2)Not permitted (2)Not permitted (2)
1(a) Block of flats, with sprinkler system (3)906030 †60 + §60 + §90 +120 +
1(b) and 1(c) DwellinghouseNot applicable (4)30 * †30 †60 (5)60 (5)Not applicable (4)Not applicable (4)
2(a) Residential: institutional906030 †606090120 ‡
2(b) Residential: other906030 †606090120 ‡
3 Office, without sprinkler system906030 †606090Not permitted (6)
3 Office, with sprinkler system (3)606030 †30 †30 †60120 ‡
4 Shop and commercial, without sprinkler system906060606090Not permitted (6)
4 Shop and commercial, with sprinkler system (3)606030 †606060120 ‡
5 Assembly and recreation, without sprinkler system906060606090Not permitted (6)
5 Assembly and recreation, with sprinkler system (3)606030 †606060120 ‡
6 Industrial, without sprinkler system12090609090120Not permitted (6)
6 Industrial, with sprinkler system (3)906030 †606090120 ‡
7(a) Storage and other non-residential, without sprinkler system12090609090120Not permitted (6)
7(a) Storage and other non-residential, with sprinkler system (3)906030 †606090120 ‡
7(b)(i) Open sided car park for light vehicles (7)Not applicableNot applicable15 † #15 † # (8)15 † # (8)15 † # (8)60
7(b)(ii) Any other car park for light vehicles906030 †606090120 ‡

All figures are minutes. The purpose group name in the first column is the name Table B2 itself gives the row. Where a row is split into a “without sprinkler system” and a “with sprinkler system” line, both lines are shown, because reading the wrong one is the commonest way to arrive at a period that is too short: a block of flats above 11m has no unsprinklered line at all.

The Table B2 Notes That Change the Figure

The symbols and numbers in the cells above are not decoration. Several of them move the period, and two of them remove it. These are quoted from the notes printed under Table B2.

Notes printed under Approved Document B Table B2
MarkerWhat the note says
(no marker)“For single storey buildings, the periods under the heading ‘Up to 5’ apply. If single storey buildings have basements, for the basement storeys the period appropriate to their depth applies.”
*“For the floor over a basement or, if there is more than one basement, the floor over the topmost basement, the higher of the period for the basement storey and the period for the ground or upper storey applies.”
“For compartment walls that separate buildings, the period is increased to a minimum of 60 minutes.” This is about walls between separate buildings and it applies to every purpose group carrying the marker. It is not a 60 minute floor for flats.
+“For any floor that does not contribute to the support of the building within a flat of more than one storey, the period is reduced to 30 minutes.”
§“For flat conversions, refer to paragraphs 6.5 to 6.7 regarding the acceptability of 30 minutes.”
“For elements that do not form part of the structural frame, the period is reduced to 90 minutes.”
#“For elements that protect the means of escape, the period is increased to 30 minutes.”
1“Refer to note 1, Table B1 for the specific provisions of test.”
2“Blocks of flats with a top storey more than 11m above ground level (see Diagram D6) should be fitted with a sprinkler system in accordance with Appendix E.” The note adds that sprinklers should be provided within the individual flats and do not need to be provided in common areas such as stairs, corridors or landings when those areas are fire sterile.
3“‘With sprinkler system’ means that the building is fitted throughout with an automatic sprinkler system in accordance with Appendix E.”
4“Very large (with a top storey more than 18m above ground level or with a 10m deep basement) or unusual dwellinghouses are outside the scope of the guidance provided with regard to dwellinghouses.”
5“A minimum of 30 minutes in the case of three storey dwellinghouses, increased to 60 minutes minimum for compartment walls separating buildings.”
6“Buildings within the ‘office’, ‘shop and commercial’, ‘assembly and recreation’, ‘industrial’ and ‘storage and other non-residential’ (except car parks for light vehicles) purpose groups (purpose groups 3 to 7(a)) require sprinklers where there is a top storey more than 30m above ground level.”
7“The car park should comply with the relevant provisions in the guidance on requirement B3, Section 11 of Approved Document B Volume 2.”
8Certain steel elements are deemed to satisfy the 15 minute minimum when tested to the European test method: beams supporting concrete floors at a maximum Hp/A of 230 m-1, free-standing columns at a maximum 180 m-1 and wind bracing and struts at a maximum 210 m-1, all under full design load. Guidance is also available in BS EN 1993-1-2.

Note 5 is the one most often skipped. The dwellinghouse cells at “Up to 11” and “Up to 18” print 60 minutes, but note 5 relaxes that to a minimum of 30 minutes for three storey dwellinghouses, holding 60 minutes only for compartment walls separating buildings. Note 5 is attached to those two cells and nowhere else.

Why a House Above 18 m Has No Period

Table B2 rows 1(b) and 1(c) print Not applicable, not a number, in the “Up to 30” column, the “More than 30” column and the basement column for a lowest basement more than 10m deep. Note 4 gives the reason: a very large dwellinghouse, meaning one with a top storey more than 18m above ground level or with a 10m deep basement, and an unusual dwellinghouse, are outside the scope of the guidance provided with regard to dwellinghouses.

There is therefore no Approved Document period for that building, and any figure presented as one has been invented. Take the design to a fire engineer, normally working to BS 9991, and agree the strategy with your building control body. Note that a tall block of flatsis a different purpose group, 1(a), and does have figures: 90 minutes at “Up to 30” and 120 minutes at “More than 30”, both on the sprinklered line, because note 2 makes sprinklers mandatory in a block of flats with a top storey more than 11m above ground level.

Fire Resistance by Element (AD B Appendix B, Table B1)

Table B1 says which criteria each element has to meet and for how long. Most rows point back at Table B2 for the period; the rows that carry their own number do not scale with the height of the building. The letters are defined in Table B1 note 1: R is loadbearing capacity, E is integrity, I is insulation.

Approved Document B Appendix B Table B1, specific provisions of the test for fire resistance of elements of structure
ItemPart of buildingMinimum provision, European classificationType of exposure
1Structural frame, beam or columnR, see Table B2Exposed faces
2Loadbearing wall. For a wall also described in any of the following items, the more onerous guidance should be appliedR, see Table B2Each side separately
3(a)Floor between a shop and a flat aboveREI 60 or see Table B2, whichever is greaterFrom underside
3(b)Floor in the upper storey of a two storey dwellinghouse, but not over a garage or basementR 30 and EI 15From underside
3(c)Any other floor, including compartment floorsREI, see Table B2From underside
4(a)Any part of a roof forming an escape routeREI 30From underside
4(b)Any roof that performs the function of a floorREI, see Table B2From underside
5(a)External wall, any part a maximum of 1000 mm from any point on the relevant boundaryREI, see Table B2Each side separately
5(b)External wall, any part a minimum of 1000 mm from the relevant boundaryRE see Table B2, and I 15From inside the building
5(c)External wall, any part beside an external escape routeRE 30From inside the building
6(a)Compartment wall separating a flat from any other part of the building (para 7.1)REI 60 or see Table B2, whichever is lessEach side separately
6(b)Compartment wall separating occupanciesREI 60 or see Table B2, whichever is lessEach side separately
7Compartment walls other than in item 6 or item 10REI, see Table B2Each side separately
8(a)Protected shaft, excluding any firefighting shaft: any glazing described in Section 7 Diagram 7.2E 30Each side separately
8(b)Any other part between the shaft and a protected lobby or corridor described in Section 7 Diagram 7.2REI 30Each side separately
8(c)Any part of a protected shaft not described in 8(a) or 8(b)REI, see Table B2Each side separately
9(a)Enclosure to a protected stairway, where it does not form part of a compartment wall or a protected shaftREI 30Each side separately
9(b)Enclosure to a lift shaft, on the same conditionREI 30Each side separately
10Wall or floor separating an attached or integral garage from a dwellinghouseREI 30From garage side
11Fire resisting construction in dwellinghouses not described elsewhereREI 30Each side separately
12Firefighting shaftsREI 120From side remote from shaft
12(a)Construction separating a firefighting shaft from the rest of the buildingREI 60From shaft side
12(b)Construction separating firefighting stair, firefighting lift shaft and firefighting lobbyREI 60Each side separately
13(a)Enclosure to a protected lobby, where it is not a compartment wall or described in item 8REI 30Each side separately
13(b)Enclosure to a protected corridor, on the same conditionREI 30Each side separately
14Sub-division of a corridorREI 30Each side separately

Three rows are worth reading twice. Item 9(a) fixes the enclosure to a protected stairway at REI 30, and it does not rise with the height of the building; where those same walls are also a compartment wall or a protected shaft, items 6, 7 or 8 apply instead and those do point at Table B2. Item 6(a) is a cap and not a floor: a compartment wall separating a flat from any other part of the building is REI 60 or Table B2, whichever is less, so in a block of flats with a top floor up to 5m it is REI 30, because Table B2 gives 30 there. And item 3(b) gives the upper floor of a two storey dwellinghouse R 30 and EI 15, which is a lower insulation period than the REI 30 usually assumed.

Table B1 note 1 also warns that the national BS 476 classifications do not automatically equate with the European classifications, so a product cannot be assumed to hold a European class unless it has been tested to it. Para B23 names the three tables and what each one does: “Table B1 gives the specific requirements for each element of structure. Table B2 sets out the minimum periods of fire resistance for elements of structure. Table B3 sets out limitations on the use of uninsulated fire resisting glazed elements.” So Table B3 exists, but it is the glazing table on escape routes, not a table of periods, and there is no Table A1 or Table A2 in this edition at all: Appendix A is Key terms. The Table A2 numbering belongs to the 2006 and 2013 editions and Table B4 to the 2019 edition incorporating the 2020 and 2022 amendments.

Fire Doorset Provisions (AD B Appendix C, Table C1)

Doorset ratings come from Table C1, not from the period of the surrounding construction, so they are frequently a different number from the wall the door sits in. Para C13 states the link explicitly: the performance of some doorsets in Table C1 is tied to the minimum periods for elements of structure in Tables B1 and B2, and limitations on uninsulated glazing in fire doorsets are given in Table B3.

Approved Document B Appendix C Table C1, provisions for fire doorsets
ItemPosition of doorMinimum integrity, European standardAlternative, BS 476-22
1In a compartment wall separating buildingsSame as for the wall in which the door is fitted, but a minimum of 60 minutesSame, minimum 60 minutes
2(a)In a compartment wall, if it separates a flat from a space in common use. This is the flat entrance doorE 30 SaFD 30 S
2(b)Enclosing a protected shaft forming a stairway wholly or partly above the adjoining ground, in a building used for flats, other residential, assembly and recreation, or office purposesE 30 SaFD 30 S
2(c)Enclosing a protected shaft forming a stairway not described in 2(b)Half the period of the wall it is fitted in, but 30 minutes minimum, with suffix SaHalf, 30 minutes minimum, suffix S
2(d)Enclosing a protected shaft forming a lift or service shaftHalf the period of the wall it is fitted in, but 30 minutes minimumHalf, 30 minutes minimum
2(e)In a compartment wall, not described in 2(a) to 2(d)Same as for the wall in which it is fitted, adding Sa only if the door is used for progressive horizontal evacuation under the guidance to requirement B1Same as the wall, adding S on the same condition
3In a compartment floorSame as for the floor in which it is fittedSame as the floor
4(a)Forming part of the enclosures of a protected stairway, except as described in item 9 or 11(b)E 30 SaFD 30 S
4(b)A lift shaft (para 3.99b) that does not form a protected shaft in 2(b), 2(c) or 2(d)E 30FD 30
5(a)Forming part of the enclosure of a protected lobby approach, or protected corridor, to a stairwayE 30 SaFD 30 S
5(b)Any other protected corridorE 20 SaFD 20 S
5(c)A protected lobby approach to a lift shaft (paras 3.102 to 3.104)E 30 SaFD 30 S
6Giving access to an external escape routeE 30FD 30
7(a)Sub-dividing corridors connecting alternative exitsE 20 SaFD 20 S
7(b)Sub-dividing dead-end portions of corridors from the remainder of the corridorE 20 SaFD 20 S
8Any door within a cavity barrierE 30FD 30
9Any door forming part of the enclosure to a protected entrance hall or protected landing in a flatE 20FD 20
10(a)Any door forming part of the enclosure to a place of special fire hazardE 30FD 30
10(b)Any door forming part of the enclosure to ancillary accommodation in care homes (para 2.44, AD B Volume 2)E 30FD 30
11(a)In a dwellinghouse, between a dwellinghouse and a garageE 30 SaFD 30 S
11(b)Forming part of the enclosures to a protected stairway in a single family dwellinghouseE 20FD 20
11(c)Within any fire resisting construction in a dwellinghouse not described elsewhere in Table C1E 20FD 20

Self-closers. Appendix C5: all fire doorsets, including to flat entrances and between a dwellinghouse and an integral garage, should be fitted with a self-closing device, except fire doorsets to cupboards, fire doorsets to service ducts normally locked shut, and fire doorsets within flats and dwellinghouses. So the garage door is expressly named as one that must self-close, while the doors on a protected stairway inside a single family dwellinghouse are not.

The Sa suffix. Table C1 note 2: unless pressurisation techniques complying with BS EN 12101-6 are used, these doors should either have a leakage rate not exceeding 3 m3/m/hour from head and jambs only when tested at 25 Pa under BS 476-31.1, or meet the additional Saclassification when tested to BS EN 1634-3. The suffix is not attached to every fire door: Table C1 leaves it off items 3, 4(b), 6, 8, 9, 10(a), 10(b), 11(b) and 11(c), and on item 2(e) it applies only where the door serves progressive horizontal evacuation.

FD 20 in practice. FD 20 doorsets are no longer manufactured or third-party certified, so an FD 30 door is normally fitted where Table C1 asks for E 20. Fitting the higher-rated door satisfies the requirement; it does not mean the requirement was 30 minutes.

Version note.The Table C1 above carries the banner “Effective until 29 September 2026”. The 2026 amendment, effective from 30 September 2026, adds the words “or an evacuation shaft” to items 2(b), 2(c), 4(a) and 5(a). None of the ratings in the table change.

Scotland, Wales and Northern Ireland

Approved Document B applies in England. Scotland uses the Building (Scotland) Regulations Technical Handbooks, Section 2 (Fire), which set out their own classifications and tables rather than Tables B1, B2 and C1. Wales has its own Approved Document B, which has diverged from the England version. Northern Ireland uses Technical Booklet E, which is broadly similar to Approved Document B but may sit on a different edition date. Check the document for the jurisdiction the building is in.

Related Calculators

The Part B Fire Calculator performs this same Table B2 lookup for a given purpose group, height and basement depth, and returns the out of scope result rather than a period where Table B2 reads “Not applicable”. Use the Fire Resistance Wall Calculator to specify wall constructions for a required rating, or the Fire Stopping Calculator for penetrations through compartmentation.

Figures on this page were read from the rendered pages of the Approved Document B Volume 1 PDF on gov.uk, 2019 edition incorporating the 2020, 2022 and 2025 amendments, collated with the 2026 and 2029 amendments. Table B2 carries the banner “Effective until 1 September 2029”; a 2029 amendment version of it is printed later in the same document. Approved Documents are updated periodically, so check the current edition on gov.uk before relying on any figure for a live project.